1 1
1 1
天铭 天铭
全部产品分类 >

Wenzhou Cangnan Zhujia Station Project

Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
1
product details
Parameters

The provincial key water conservancy project and the largest sluice project in our city, the Zhujiazhan sluice reinforcement project in Cangnan County, passed the inspection and acceptance of the closing sluice impoundment stage on August 8.
   Zhujiazhan Sluice Project is located in the Hengyang Branch River section of Cangnan County, 200 meters to 350 meters away from Aojiang River. It has comprehensive functions such as flood control, tide blocking and fresh water storage. The project started construction in July 2012. The scale of the project is a large (two) sluice with a designed drainage flow of 1066 cubic meters per second. The design flood standard for the sluice is once in 50 years, and the check standard is once in 100 years. The total investment is 147 million. Yuan, the design period is 30 months. After two years of intense construction, the project was successfully completed 8 months earlier than the original schedule.
After the project passes the inspection and acceptance, the new sluice will take over from the dangerous sluice and undertake the task of draining the floodwaters of 338 square kilometers in the Hengyang branch river basin, directly protecting the lives and property safety of more than 700,000 people in Nangang and Jiangnan plains and 88,000 mu of arable land. Provide guarantee for the irrigation water of 284,000 acres of farmland, and at the same time play the role of blocking waves and tides.
  The Spiritual Civilization Construction Steering Committee of the Ministry of Water Resources announced the review results of the 2013-2014 National Civilized Construction Sites of Water Conservancy Construction Projects. Cangnan Zhujia Station Sluice Reinforcement Project was listed on the list and won the honor.
In recent years, Cangnan County Water Conservancy Bureau has strengthened the management of water conservancy construction projects by earnestly fulfilling its supervisory responsibilities, comprehensively promoted the creation of "safe and civilized standard chemical sites", advocated civilized and safe construction, in-depth development of civilized construction sites, and continuously strengthened civilized construction management of projects And safety and quality management, a large number of high-quality, demonstration projects have emerged.
It is reported that the "Civilized Construction Site of National Water Conservancy Construction Project" is currently the highest award in the field of civilized construction site construction of the domestic water conservancy system. Its assessment criteria include six aspects: institutional mechanism, quality management, safe construction location, environmental harmony, civilized fashion and creation measures. standard. The “2013-2014 National Civilized Construction Site of Water Conservancy Construction Projects” has only four projects in the province, and our county's water conservancy projects have won the honor.
   Zhujiazhan Sluice Reinforcement Project is one of the key flood prevention and disaster reduction projects in our city, and it is included in the provincial and municipal "Strong Pond" plan. The design scale of the project is a large (two) type sluice with a total of 5 holes×10m, a total clear width of 50m, the design standard is once in 50 years, the calibration standard is once in 100 years, the maximum flow capacity is 1066m3/s, and the total investment is 147.4 million yuan. In the process of project construction, in order to bring the project benefits into full play as soon as possible, the project legal person and design and construction units have optimized the design of the underwater part of the sluice, and technically processed the engineering details, so that the original two cofferdams became one cofferdam. Breakthroughs have been made in the progress of key links and the construction period has been greatly shortened. At the same time, due to the lack of one cofferdam in the construction of the project, the project amount and material input were reduced, and the entire project saved 10 million yuan. The project was awarded the honorary title of 2014 "Zhejiang Construction Safety and Civilized Construction Standard Chemical Site" and "Wenzhou Water Conservancy Engineering Safety and Civilized Construction Standard Chemical Site".

  

Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table

CopyRight © 2020   Shandong Tianming Heavy Industry Technology Co., Ltd.   All Rights Reserved.   鲁ICP备12021762号-1    Powered by www.300.cn